<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"><channel><title>Mario Schoch — Project updates</title><description>Progress notes from my engineering and software projects.</description><link>https://marioschoch.ch</link><language>en</language><item><title>VELOVE Website Rebuild: First version deployed to a preview URL</title><link>https://marioschoch.ch/projects/velove-website/#2025-10-10-velove-first-deploy</link><guid isPermaLink="true">https://marioschoch.ch/projects/velove-website/#2025-10-10-velove-first-deploy</guid><description>The first version is live on a preview URL. Session dates now come from a single data file, and the home page scores 98 on mobile Lighthouse. Next: review with the board.</description><pubDate>Fri, 10 Oct 2025 00:00:00 GMT</pubDate><category>VELOVE Website Rebuild</category></item><item><title>VELOVE Website Rebuild: Kick-off and content audit</title><link>https://marioschoch.ch/projects/velove-website/#2025-09-15-velove-kickoff</link><guid isPermaLink="true">https://marioschoch.ch/projects/velove-website/#2025-09-15-velove-kickoff</guid><description>Collected feedback from volunteers and students about the old site. The clear winner among requests: show the next repair session on the front page, with date, time and location.</description><pubDate>Mon, 15 Sep 2025 00:00:00 GMT</pubDate><category>VELOVE Website Rebuild</category></item><item><title>Line-Following Delivery Robot: Shooter v2 — redesigned cam and stiffer spring</title><link>https://marioschoch.ch/projects/delivery-robot/#2025-05-02-robot-shooter-v2</link><guid isPermaLink="true">https://marioschoch.ch/projects/delivery-robot/#2025-05-02-robot-shooter-v2</guid><description>The first shooter undershot by about 30 %. After measuring the actual spring constant on a tensile tester, I redesigned the cam profile. Landing accuracy at 1 m improved from ±40 mm to ±12 mm across 20 test shots.</description><pubDate>Fri, 02 May 2025 00:00:00 GMT</pubDate><category>Line-Following Delivery Robot</category></item><item><title>Line-Following Delivery Robot: First complete lap on the test track</title><link>https://marioschoch.ch/projects/delivery-robot/#2025-03-14-robot-first-track-run</link><guid isPermaLink="true">https://marioschoch.ch/projects/delivery-robot/#2025-03-14-robot-first-track-run</guid><description>After two weeks of tuning, the prototype completed its first full lap without leaving the line. The PID controller still oscillates on tight curves, so the next step is adding a derivative filter and logging sensor data at higher frequency.</description><pubDate>Fri, 14 Mar 2025 00:00:00 GMT</pubDate><category>Line-Following Delivery Robot</category></item><item><title>Design Analysis of the BMC Hinge Fork: Final report submitted</title><link>https://marioschoch.ch/projects/bmc-hinge-fork/#2024-12-20-hinge-fork-report</link><guid isPermaLink="true">https://marioschoch.ch/projects/bmc-hinge-fork/#2024-12-20-hinge-fork-report</guid><description>Submitted the final report with the comparison between the hinge fork and a rigid reference fork. Key takeaway: the hinge buys a lot of comfort for very little lateral stiffness.</description><pubDate>Fri, 20 Dec 2024 00:00:00 GMT</pubDate><category>Design Analysis of the BMC Hinge Fork</category></item><item><title>Design Analysis of the BMC Hinge Fork: FE model of the hinge region converged</title><link>https://marioschoch.ch/projects/bmc-hinge-fork/#2024-11-08-hinge-fork-fe-model</link><guid isPermaLink="true">https://marioschoch.ch/projects/bmc-hinge-fork/#2024-11-08-hinge-fork-fe-model</guid><description>Mesh convergence study done: refining the hinge region below 1 mm element size changed peak stresses by less than 2 %, so the model is good enough for the comparison study.</description><pubDate>Fri, 08 Nov 2024 00:00:00 GMT</pubDate><category>Design Analysis of the BMC Hinge Fork</category></item></channel></rss>